After multiple layers of taping/mudding we get things textured.
You never really realize how many screws really go into sheetrocking until you have to cover them all.
With lots of taping to do, Jim wastes no time getting started on it. Jim gets a first coat on the upper level and the main level.
We continue sheetrocking the main level as well as the garage.Boy does it look nice. Now time to get some taping done.
With around 200 sheets of sheetrock to hang, theres no time for messing around. With Jim leading the way we try to keep up & get things rolling along. It sure changes the feel & the look of everything once it starts to go up.
Page 1 of 12